Need for the Project

The majority of Textile industries have their own effluent treatment plant and after treating the waste they were discharging the effluent in open gutter. The treatment efficiency of individual ETP’s are also poor. Also treatment cost is not affordable to these industries. The domestic as well as industries effluents city area goes to Kala Nalla, nalla behind Niramay Hospital , and Industrial estate Nalla and Chandur Nalla by means open gutters. These nalla finally meets Panchaganga River.

The 12 MLD CETP is helping to treat the Textile effluent, which was directly disposed in nalla and gutter with or without treatment .The nalla finally meets to Panchganga River. The Panchaganga River is included counted amongst topmost polluted river in the country . The Panchganga River is included in National River Conservation Plan (NRCP) to improve the water quality of the rivers. The river is classified as A2, as per the RRZ policy of Maharashtra State. The river quality is not as per the river classification A2 and bacterial contamination is also increased.

There are number of existing rural water supply schemes on Panchganga River, downstream of the Ichalkaranji city which got affected due to River pollutions Now a day’s river water is used only irrigation purpose. The Ichalkaranji gets water supply from the Krishna River. Ichalkaranji and its neighboring areas are facing server water borne diseases like due to the disposal of Industrial effluents and Sewage from Ichalkaranji Municipal council and Kolhapur Municipal corporation in Panchganga River. The 12 MLD CETP will help to reduce the some pollution load Panchganga River.

Project Category

All the CETP units are Lister at Serial no. 7(h) of the Schedule of EIA Notification of 14-09-2006 and categorized under Category ‘B’ and requires an Environmental Clearance.

The Purpose of this Environment Impact Assessment (EIA) study is to provide information on the surrounding and the extent of environmental impact likely to arise on account of the proposed expansion.

Project Location

The project is located at at R.S. No 610 A, Ichalkaranji, Tal: Hatkanangle , Dist: Kolhapur, Maharashtra . The project location details are mentioned in following table:

Site Data
Particular Data
Nearest railway station Hatkanangle (8 km)
Nearest airport Kolhapur (19.50 km)
Nearest National Highway NH-204 (1.5 km)
Site elevation 1797 ft
Nearest River Panchganga 2.77 km
Latitude 740 28’ 06.84” E
Longitude 16y041’ 29.99”N
Project Description

The plot of 10568 m2 area has been allotted by the Ichalkaranji Municipal Council to ITDC for setting CETP.

Salient Features for proposed projecrt
Sr.No Particulars Details
1 Plot Area (m2) 10568
2 Built up Area (m2) 2060
3 Domestic water requirement (m2/day) 10
4 Water Requirement for polyelectrolyte preparation (m2/day) 56
5 Treated sewage for dilution (m2/day) 9300
6 Power requirement (MW) 1.0
7 Manpower requirement (nos) 27
8 No. of textile units contribution to Effluent 62 process units, 122 sizing units
9 D.G Set Capacity 750 kVA
10 Disposal of treated Effluent TO NALLAH
11 CETP Sludge (kg/day) Chemical Sludge :11655
Biological Sludge:2888
12 Disposal of CETP Sludge CHWTSDF
13 Project Cost Rs. 2275 lacs.
Contribution Effluent to CETP
Sr.No Type of unit Discharge MLD
1 Power Process 07.390
2 Hand Process 02.800
3 a) Stenter 00.075
  b) Hand with Stenter 00.625
4 Sizing 01.110
  Total 12.000
  Expansive 25 % 03.000
  GRAND TOTAL 15.000